Hot Water System Replacement Checklist

Use this checklist before and during a hot water system replacement. It covers the old unit, sizing, placement, the Queensland rules and what a good quote spells out. A few terms come up often. A controlled load tariff (a cheaper off-peak rate for the tank) shows as its own line on the power bill. A tempering valve (it blends hot and cold water) keeps bathroom taps at 50°C or less. The STC discount (money off from small-scale technology certificates) applies to heat pumps and solar. The Form 4 (a notice to the QBCC) is lodged by your plumber after the install.

Hot Water System Replacement Checklist

Tell us about your hot water system

Tell us your current system, what it is doing and your suburb, and get your hot water sorted.

Household size helps the plumber suggest the right tank size.

See our privacy policy.

0 of 22 ticked

Method: how this hot water system checklist was built

The checks that decide whether a replacement goes smoothly: the old unit, sizing, placement, the licences involved and the paperwork you should end up with.

It is not a compliance assessment or a quote, and ticking every item does not replace the licensed plumber's own checks on site.

Each item rests on the Queensland rules and published guidance on sizing, placement and running costs. Ticks are saved in this browser only and are not sent anywhere.

Assumptions

  • The home is in Queensland, so QBCC plumbing licensing, the 50°C delivery limit and the Form 4 apply.
  • Heat pump and solar items assume a model listed on the Clean Energy Regulator register.
  • Tariff items assume an Energex supply, which covers the Sunshine Coast.

Rules: QBCC guidance for Queensland home owners, the Queensland Government hot water systems page and Energex economy tariffs.

Get it priced

Tell us your current system, what it is doing and your suburb, and get your hot water sorted.